OpenRTB 2.3 Integration Plan

Document created by pubmatic-archivist on Mar 27, 2017Last modified by catherine.racette on Sep 3, 2017
Version 11Show Document
  • View in full screen mode

OpenRTB 2.3 Documentation 

OpenRTB 2.3 Introduction 

OpenRTB 2.3 Integration Plan 

OpenRTB Bid Request Objects and Parameters 

OpenRTB Bid Response Objects and Parameters 

OpenRTB 2.3 PubMatic Extensions 

Open RTB 2.3 Examples 

OpenRTB Ad Server API Cookie Sync 

OpenRTB 2.3 Click Tracking 

OpenRTB 2.3 Win/Loss Notification 

OpenRTB 2.3 API Performance 

OpenRTB 2.3 Known Limitations & Reference 

Integration Plan 

The PubMatic integration plan uses the following steps:

  1. Review and implement the RTB API specification.
  2. Complete the Technical Questionnaire.
  3. Plan your integration timeline.
  4. Perform Integration Testing.
  5. Release.

Step 1: Review the API Specification

Review the API Specification for technical clarifications.

 

Step 2: Complete the Technical Questionnaire

Request the Technical Questionnaire from your PubMatic Customer Success Manager. Return the completed form via email.

 

Step 3: Plan Your Integration Timeline

Share your timeline for the following with your Customer Success Manager:

  • API Service Implementation
  • Integration Testing
  • Planned API Integration Release Date 

 

Step 4: Perform Integration Testing

Prerequisites

  1. Technical Questionnaire should be completed and returned at least 2 weeks prior to integration testing.
  2. Unit tested API Service should be available
  3. Working creative URL/ad tag (PSA ads are good enough)

Testing

  1. Functionality:
    - test with correct request/response
    - test with invocation of Creative URL/ad tag to see whether ad loads correctly
    - test the click tracking mechanism
    - test the reports to validate the calls made, revenue (bid values), clicks made
  2. Performance:
    - test request/response timing (should be <75ms)
  3. Load:
    - test with multiple request/response in parallel (upto peak load of ~1800 requests per second as of now)
  4. Exception:
    - test with missing/mal framed/delayed request, response

Planned Testing Phases

  1. Phase 1 [request, response, parameters validation]
    - Test only request/response format and validation of all mandatory parameters.
    - No real impressions/bid value involved.
    - This can happen even on a non-production server once your software is ready.
    - timeline : 1-2 days
    - less than 5,000 imps per day
  2. Phase 2 [with test impressions, test ads]
    - Test on production server with test impressions
    - Test feature, performance, timeout, throughput and load
    - Validate the API, ad serving, cookie, tracking mechanism at both ends
    - timeline : 2-3 days
    - 50K Impressions each with 50,100,200,300 requests in parallel
  3. Phase 3 [test with real impressions, real ads, Demand Partner pays for the impressions]
    - test on production server with real impressions [low volume]
    - test feature, performance, timeout, throughput and load
    - validate the ad serving, cookie, tracking mechanism at both ends
    - verify the reporting figures at both ends
    - timeline : 3 days of testing and 2-3 days for validation of reports
      [Demand Partner pays for the winning impressions]
    - less than 100,000 imps per day

Step 5: Release

After successful API Integration Testing, PubMatic shall release the API service for Integration with RTB traffic from PubMatic.